Lukhvano-Zaragula village connecting road
Landslide
High
year 2021
recommendation
Periodic realignment of the deformed road section and arrangement of a drainage channel on the upper side of the road, along the existing protective gabion, in order to release the water flow. The advantage of building a new road should be confirmed only on the basis of detailed engineering-geological studies.
year
Monitoring result
Status of the current year will be updated based on the information provided by the user.