The right slope of the gorge of the Avan river, the section of the road connecting to the main structure of Avanihesi
Landslide
Medium
year 2021
recommendation
Periodic cleaning and removal of fallen landslide material. According to the project developed on the basis of detailed engineering studies, the arrangement of a protective wall with drainage holes and arrangement of road signs warning of danger. Conducting monitored observations
year
Monitoring result
Status of the current year will be updated based on the information provided by the user.