Bazaqlo village, surrounding area

Gullying

Medium

year 2021

recommendation

Replacement of inner district road and erosive gully exit pipe at crossing area. Installation of a large diameter pipe or a single-lane bridge instead of the existing low-permeability pipe. Arrangement of (restrictions) in the ravine for the purpose of prevention of tilting-erosive processes. Cultivation of thermophilic vegetation with a deep root system; Conducting monitored observations

year

Monitoring result

Status of the current year will be updated based on the information provided by the user.

We look forward to future updates and your involvement in monitoring the performance of existing data and recommendations. You can provide us by e-mail or through the contact form on this page, information about the geological process near your residence, current conditions, current or implemented measures with photo evidence.